Production Costing Methods

Production Costing Methods

There are various costing methods that each inform cost accounting in their own way. We will go through four of the more common ones.

Standard Costing

Standard costing is perhaps the most common costing method. It is based on calculating standard rates for the direct and indirect costs of products. These predetermined “standards” are usually based on the company’s previous experiences and are routinely updated to reflect market fluctuations.

Standard costing is very beneficial for creating and polishing budgets as it gives predefined cost estimates that can be measured against actual expenses. This provides insight into company expenditure and reveals inefficiencies. The chief disadvantage lies in having to routinely update the standards which can be arduous in case of constantly changing market conditions.

Job Costing

The job order costing method calculates costs per manufacturing project or unit, making it useful for make-to-order manufacturers, construction manufacturers, and the like. A typical job costing process for a project will sum together its direct costs and add to that a share of the company’s manufacturing overhead proportional to the amount of storage space, utilities, etc. that was allocated for the project.

Job costing is advantageous for returning close-to-exact cost values per finished project or finished good. It is sometimes difficult to manage, however, as individual tracking and allocation of costs can be time-consuming.

Process costing

This costing method is similar to job costing, however, it calculates item costs by adding together the direct costs and overheads per processing step of a product’s lifecycle, rather than per individual item or job. This makes it a favorable costing method for process manufacturers and other companies that otherwise produce large numbers of identical units.

Process costing is beneficial for saving time as calculating costs need not to be completed for each individual unit. The downside is that the costs per unit can become inaccurate since rounding up costs per process can introduce discrepancies.

Activity-based costing (ABC)

ABC is a common albeit complex costing method that relies on separately identifying the indirect costs of all production activities and allocating them to cost pools – groups of related overhead costs occurring with specific activities. The overhead cost of a cost pool is then divided by the number of units in the activity to arrive at the activity rate – a fixed amount that is added to each unit’s cost.

ABC is a very accurate costing methodology that helps to factor indirect costs into unit pricing. It can be more difficult to implement than standard or job costing, however, as a more detailed overview is required over the manufacturing process.

 

Continue at: https://www.mrpeasy.com/blog/manufacturing-accounting/

The text above is owned by the site above referred.

Here is only a small part of the article, for more please follow the link

Also see:

www.manostaxx.com

 

Manostaxx
Manostaxx – Industrial Management Consulting

Comments

No comments yet. Why don’t you start the discussion?

    Leave a Reply

    Your email address will not be published. Required fields are marked *